Cable Set

  • Standardized wire length

  • Full cable set

  • Pre-installed plugs

  • Plug and play

Parameter List

6.jpg

Name

Specification

Area

Outer Diameter

20℃ max conductor resistance

Rated Voltage

Rated Capacity *

PV DC Cable

H1Z2Z2-K 1×6mm²

1×6 mm²

6.3±0.15mm

≤3.39 Ω/km

DC:1500V AC:1000V

70A

Inverter to Battery DC Cable

UL 11627 8AWG

1×8 AWG

6.50±0.20mm

2.23 Ω/km

2000V

50A

UL 11627 10AWG

1×10 AWG

4.80±0.20mm

3.546 Ω/km

2000V

30A

On Grid AC Cable

NYY-5×4mm²

5×4 mm²

16.3±0.50mm

4.95 Ω/km

600/1000V

25A

NYY-5×6mm²

5×6 mm²

19.1±0.50mm

3.3 Ω/km

600/1000V

32A

Backup AC Cable

NYY-5×4mm²

5×4 mm²

16.3±0.50mm

4.95 Ω/km

600/1000V

25A

NYY-5×6mm²

5×6 mm²

19.1±0.50mm

3.3 Ω/km

600/1000V

32A

Inverter & Battery PE

H07V-K 6mm²

1×6 mm²

4.80±0.10mm

3.3 Ω/km

450/750V

36A

PV Roof Grounding

NYY-1×6mm²

1×6 mm²

9.5±0.20mm

3.3 Ω/km

600/1000V

40A

Ethernet Cable

UTP CAT5e

Meter Cable

H03VV- F 4×0.5mm²

4x20 AWG

7.0±0.2mm

36.7 Ω/km

600V

9A

Name

From

To

Remark

PV DC Cable

PV Modules

Inverter PV connector

Cable terminals are made and installed on site

Inverter to Battery DC Cable

Inverter Battery connector

Battery output connector

Cable terminals are prefabricated and installed at the factory

On Grid AC Cable

Inverter On-grid output terminal

Original distribution box

Inverter side terminal is prefabricated and installed at the factory

Backup AC Cable

Inverter Backup output terminal

Back-up loads

Inverter side terminal is prefabricated and installed at the factory

Inverter & Battery PE

Inverter & Battery grounding hole

External ground Bar

Inverter & Battery side terminals are prefabricated and installed at the factory

PV Roof Grounding

PV supporting bracket

External ground Bar

Cable terminals are made and installed on site

Ethernet Cable

Inverter Multi-com Connector (COM2)

Meter

Both side terminals are prefabricated and installed at the factory

Ethernet Cable

Inverter Multi-com Connector (COM2)

Battery

Both side terminals are prefabricated and installed at the factory

Meter Cable

Meter terminal (1,2,3,4)

Grid (L1, L2, L3, N)

Meter side terminal is prefabricated and installed at the factory

* Free in air rated capacity

Copyright © 2023 Slenergy Technology (A.H.) Co., Ltd.